You are not logged in.

Search results

Search results 1-2 of 2.

Friday, June 28th 2019, 2:33pm

Author: tpothen

Pipe size question

Hello - I'm just starting the design of my system and am wondering this.. My city water connection after the meter is 3/4 inch copper and I'll be cutting this to put a T in to go to the PBV. Should I stick with 3/4 in or size it up to 1" copper after the T?

Thursday, June 27th 2019, 8:29pm

Author: tpothen

PVB install on new system

Hi all - I'm using the Rain Bird design system but want to install the PVB before doing anything else as I need the city to inspect it. My question is.. should I tap into the current spigot line (3/4") which is at the end of the line for my house or should I tap into the mainline after the meter and run a new line outside?