You are not logged in.

tpothen

New Member

Posts: 2

Location: Central Minnesota

1

Thursday, June 27th 2019, 8:29pm

PVB install on new system

Hi all - I'm using the Rain Bird design system but want to install the PVB before doing anything else as I need the city to inspect it. My question is.. should I tap into the current spigot line (3/4") which is at the end of the line for my house or should I tap into the mainline after the meter and run a new line outside?

Rate this thread