You are not logged in.

Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

KingClient

Unregistered

1

Thursday, July 31st 2014, 10:40pm

System tear out

I have a client (townhome association) that wants a bid on a brand new system. Except Backflow and pump. The mainline is 2" and runs several thousand feet. It's 33 zones and covers about 3.5 acres. They have had a lot of problems with it. It's 16 years old and all laterals are PVC. This year I have fixed the main line in 3 places, fixed 7 or more lateral breaks, replaced the pump and flow switch. There are a ton of driveways and laterals run under each. This is a huge pain, they know it's going to cost an insane amount of money. I also found quite a sediment in the mainline and several of the laterals.

I have tried talking them out of it, but they insist on it.

Any advice for a complete system redo? The tear out will be the hardest since all heads will need to be removed also.

Wet_Boots

Supreme Member

Posts: 4,102

Location: Metro NYC

2

Friday, August 1st 2014, 7:11am

Where's the location? I would shy away from removing the old system, and maybe spec a different material for the new lines, should location allow.

Rate this thread