You are not logged in.

Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

cucu

Starting Member

1

Monday, May 23rd 2005, 2:59am

Need help with design ASAP

Hi everyone,

I am starting to design my sprinkler system. The water meter is 5/8", main line size is 3/4" copper. According to this, I can only achieve a maximum of 10GPM. I tapped onto the mainline (in the basement before pressure reducer) to lead to two separate 3/4" PVC line locations (left and right of house). My questions are:
1) If I increase the tapped line size from 3/4" to 1", can I attain the 15 GPM design load? Or am I limited by the 3/4" mainline max 10 GPM?

2) The incoming pressure (main line) is 65 psi. The pressure I get from a hose bib is only 40 psi (after pressure reducer). Since I will tapping from the main line, should I be designing from the 65 psi or the 40 psi?

3) How much pressure do I lose if I increase to 1"? Will the new 1" line have the same 65 PSI?

Thanks for all of your help.

Rate this thread