You are not logged in.

salake

Starting Member

1

Saturday, June 4th 2011, 11:05pm

Programing a Rainbird Controler for different value operations at different times on the same day.

I have a new Rainbird Controller with 5 zones in the system. I wish to start at 0400 an run all zones. At 1600 I wish only to run zones 3 & 5. I wish to do this on Sunday, Tuesday and Thursday. How do I accomplish this?

Wet_Boots

Supreme Member

Posts: 4,102

Location: Metro NYC

2

Sunday, June 5th 2011, 8:05am

You need to create a second program for the 1600 start time, and assign zones 3 and 5 to it

Rate this thread