1" PE design question
Hi everyone,
I read somewhere that I should use 3/4" PE running to the last head in a zone. My plan calls for 1" all around.
Unless I change something, I need 528 feet of PE. I can only get PE in 100 ft length. So, can I use 28 ft of my leftover 3/4" PE on my last head that will be MP Rotator MP1000. Last 28 feet runs downhill about 5 feet elevation drop.