Good answer, Gator. Thanks.
Yes, I'm dealing with sch 40 in clay soil 14-15" deep, times 3. Thus, it sounds like my initial idea to dig most, if not all, the pipe from the valve to the first spklr head is "enough."
Thanks too for the info on possible products that can be used on the output side of the valve that I can check out.