You are not logged in.

Fabio

Unregistered

1

Monday, March 24th 2014, 8:18am

Precipitation Rate of MPRCS515

I would like to know how to calculate the precipitation rate for MPRCS515. I am planning on having the following configuration:
@----------------
| |
----------------@
35PSI working pressure, area 5' x 15', 2 heads located diagonally opposed.

Central Irrigation

Supreme Member

Posts: 364

Location: Central Minnesota

2

Monday, March 24th 2014, 10:31am

Pr = (96.25 X Total GPM )/ Total Area (sq.ft)

Pr...precip rate
96.25.......constant
Total GPM.....Add total GPM of heads in area. .4 GPM
Total Area.....5x15=75sq.ft

Precip rate for your scenario yields a rate of 0.51" per hour.

This post has been edited 1 times, last edit by "Central Irrigation" (Mar 24th 2014, 10:49am)


Fabio

Unregistered

3

Monday, March 24th 2014, 12:55pm

Thank You!!!

Pr = (96.25 X Total GPM )/ Total Area (sq.ft)

Pr...precip rate
96.25.......constant
Total GPM.....Add total GPM of heads in area. .4 GPM
Total Area.....5x15=75sq.ft

Precip rate for your scenario yields a rate of 0.51" per hour.
Thank You!!!

Rate this thread