My installer ended up putting in a FEBCO 860 (RPZ) I hope that I dont have any problems with the device or the City Inspector. What kind of support, if any, is usually used as PVC is not that strong?
I live in Central Texas Area where my local code requires the back flow devices to be above ground. Here is my problem: I live on a hill with a steep sloping front yard. My water meter is at the lowest point in the side walk. Most of the articals I have read says the devise must be six inches above the highest sprinkler head.The installers installed a FEBCO Pressure Vacuum Breaker, model 765 at the bottom of the hill just above the water meter. I brought it to their attention that it must be 6 i...