End of line drain
I posted this in another area a couple days ago and received no replies yet ...
How is the HP1500 end-of-line drain installed? I have 1/2" poly tubing, clamped end for now - until I install the drain. The drain has two connections - one is barbed and the other is threaded. Do I connect the barbed end into my tubing and cap off the threaded opening? Does it matter how the drain is oriented (wicking pad up or down)?